Léim chuig an ábhar
MRK Real Estate
← Gach tionscadal

Aryam Tower

le Abu Al Naga Development · Al Furjan

Forbróir
Abu Al Naga Development
Pobal
Al Furjan
Stádas
Á thógáil
Praghas tosaigh
AED 1.3M
Láimhseáil
Q2 2028
Plean íocaíochta
40% during construction, 60% on handover

Cineálacha áitribh: 1 Bedroom · 2 Bedroom · 3 Bedroom

Forléargas

I mBéarla, mar a foilsíodh ar dtús.

Aryam Tower launched in November 2025 in Al Furjan's Jebel Ali side.

Sixty percent of the price is payable on completion, scheduled for mid-2028.

Buaicphointí

I mBéarla, mar a foilsíodh ar dtús.

  • One- to three-bedroom apartments
  • Handover-weighted 40/60 structure
  • Indoor pool and landscaped gardens

Le cur san áireamh

I mBéarla, mar a foilsíodh ar dtús.

  • Single-source pricing
  • Availability may be limited; verify with the developer

Foinsí

Léigh an leathanach iomlán i mBéarla