- Forbróir
- Deyaar
- Pobal
- Dubai Production City
- Stádas
- Á thógáil
- Praghas tosaigh
- AED 611K
- Láimhseáil
- Q4 2027
- Plean íocaíochta
- 50/50 — 50% during construction, 50% on handover
Cineálacha áitribh: Studio · 1 Bedroom · 2 Bedroom · 3 Bedroom
Forléargas
I mBéarla, mar a foilsíodh ar dtús.
Park Five is Deyaar's AED 1.5 billion cluster of five low-rise residential buildings (Elm, Ember, Neem, Alder and Ivy) arranged around a central park beside its completed Midtown community in Dubai Production City.
Entry pricing is quoted from roughly AED 611K to 720K depending on the building and portal, with 50/50 plans for the first phase and 40/60 or 45/55 structures in later buildings.
Handover is targeted for the second half of 2027, with most records pointing to September to December 2027.
Buaicphointí
I mBéarla, mar a foilsíodh ar dtús.
- Park-centred masterplan
- Proven Deyaar delivery track record next door at Midtown
- Accessible entry pricing
Le cur san áireamh
I mBéarla, mar a foilsíodh ar dtús.
- Peripheral Dubai Production City location
- Handover dates vary from June to December 2027
- Mid-market finishes
Foinsí
- Provident — Park Five — aisghafa 2026-10-31
- Leadboard — Park Five by Deyaar — aisghafa 2026-10-31
