- Forbróir
- JHK Developments
- Pobal
- International City
- Stádas
- Á thógáil
- Praghas tosaigh
- Praghas ar iarratas
- Láimhseáil
- Q4 2026
- Plean íocaíochta
- 40/60 — 40% before handover, 60% after handover
Cineálacha áitribh: Studio · 1 Bedroom · 2 Bedroom
Forléargas
I mBéarla, mar a foilsíodh ar dtús.
Tavora Residences is a JHK Developments building in Al Warsan 4, within International City Phase 2.
Launch pricing has been cited at about AED 804K, with lower agency figures; a 40/60 plan with post-handover payments is commonly listed.
Construction reached about 61% in May 2026, against a December 2026 handover.
Buaicphointí
I mBéarla, mar a foilsíodh ar dtús.
- Post-handover payment structure
- Near the future Metro Blue Line corridor
Le cur san áireamh
I mBéarla, mar a foilsíodh ar dtús.
- Prices conflict widely across sources
- Handover may slip given progress
Foinsí
- Property Finder — Tavora Residences — aisghafa 2026-11-01
