- Forbróir
- ME DO RE Properties
- Pobal
- Jumeirah Lake Towers
- Stádas
- Láimhseáil go luath
- Praghas tosaigh
- AED 2.56M
- Láimhseáil
- Q4 2025
- Plean íocaíochta
- 20% on booking, 80% post-handover
Cineálacha áitribh: Studio · 1BR · 2BR · 3BR
Forléargas
I mBéarla, mar a foilsíodh ar dtús.
Me Do Re Phase 2 follows the original Me Do Re tower in Cluster G, offering studios to three-bedroom apartments.
Construction was above 95% in mid-2025, putting the building at or near handover.
Buaicphointí
I mBéarla, mar a foilsíodh ar dtús.
- Near-complete building
- Post-handover payment structure
- Infinity pool and shared spa
Le cur san áireamh
I mBéarla, mar a foilsíodh ar dtús.
- Developer stock may be fully allocated; resale is the likely route.
- Verify current availability and pricing directly with the developer before reserving.
Foinsí
- Property Finder — Me Do Re Phase 2 project page — aisghafa 2026-11-01
