सामग्री पर जाएँ
MRK Real Estate

स्नैगिंग निरीक्षण

नया घर स्वीकार करने से पहले पेशेवर निरीक्षण कमियों की पहचान कैसे करता है।

स्रोत 2026-11-08 को जाँचे गए

नीचे दी गई विस्तृत जानकारी मूल अंग्रेज़ी में प्रस्तुत है, ठीक वैसी ही जैसी आधिकारिक स्रोतों से सत्यापित की गई है।

Snagging is a detailed inspection of a newly completed home to record defects before you accept handover. It is the point of greatest leverage with the developer.

When
Before signing the handover acceptance
Non-structural defects
Commonly one year from handover
Structural defects
Ten years under Dubai and UAE law
Who inspects
Owner or an independent snagging firm

What a snag list covers

  • Finishes: walls, joinery, tiling, sealant, paint
  • MEP: air conditioning, plumbing pressure, electrical points
  • Windows, doors, balcony drainage and waterproofing
  • Appliances and fixtures supplied under the SPA

Your protection after handover

Legal commentary on Dubai Law No. 6 of 2019 describes a ten-year developer liability for structural defects and a one-year period for non-structural items such as installations and finishes. Some contracts set shorter defects liability periods for specific items, so read the SPA.

A sensible pattern is to snag once before handover and again shortly before the one-year period ends.

Should I accept handover with defects outstanding?

Many owners do, provided every defect is recorded in writing with a rectification timeline. Accepting without a written list weakens your position.

How long does a developer have to fix structural defects in Dubai?

Commentary on Dubai Law No. 6 of 2019 describes ten years of developer liability for structural defects from completion.

स्रोत

  1. Mondaq — developer liability for defects after handover
  2. dubizzle — what is the defects liability period
  3. Bayut — Dubai property handover: procedure, cost and checklist

यह पृष्ठ सामान्य जानकारी है, कानूनी सलाह नहीं। वर्तमान शुल्क और आवश्यकताओं की पुष्टि दुबई लैंड डिपार्टमेंट या किसी पंजीकृत ट्रस्टी कार्यालय से करें।