
- 开发商
- Meraas
- 社区
- City Walk
- 状态
- 已竣工
- 起价
- AED 2M
- 交付
- Completed (2025)
户型: 1 Bedroom · 2 Bedroom · 3 Bedroom
项目概览
以英文原文发布。
Laurel is the fifth phase of Central Park at City Walk, released in Q3 2022 with one- to three-bedroom apartments around the park.
Launch pricing was about AED 2M; some brokers quote entry from AED 1.5M to 2.05M.
Metropolitan lists the building as completed, with Driven citing Q4 2025 handover; some resales still reference Q3 2026.
项目亮点
以英文原文发布。
- Completed Central Park stock
- Downtown-adjacent location
注意事项
以英文原文发布。
- Handover status inconsistent across listings
- Resale pricing varies
图库

资料来源
- Metropolitan — Central Park Laurel — 获取于 2026-10-31
- Driven Properties — Laurel Central Park — 获取于 2026-10-31
