- 开发商
- Sobha Realty
- 社区
- Sobha Hartland II
- 状态
- 在建
- 起价
- 价格面议
- 交付
- Q1 2027 – April 2028
- 付款计划
- 60/40 — Sobha Hartland II standard terms
户型: 1 Bedroom · 2 Bedroom · 3 Bedroom
项目概览
以英文原文发布。
Riverside Crescent is the earliest-delivering cluster within Sobha Hartland II, with towers handing over between Q1 2027 and April 2028. The crescent configuration maximises water frontage across the towers.
Being first to hand over within a masterplan has a practical advantage: you take possession while the wider community is still completing, which historically means buying at pricing set before the amenities are visible. It also means living alongside ongoing construction for a period.
For yield-focused buyers, earlier handover means rental income starts sooner — a meaningful difference against Skyvue's 2029 timeline.
项目亮点
以英文原文发布。
- Earliest handover within the Hartland II masterplan
- Crescent layout maximising waterfront outlook
- Rental income begins sooner than later Hartland II phases
注意事项
以英文原文发布。
- Surrounding masterplan still under construction at handover
- 40% payable on handover under the 60/40 structure
- Confirm the specific tower's handover date — the range spans over a year
资料来源
- Riverside Crescent handover schedule — 获取于 2026-08-21
