- المطوّر
- Sobha Realty
- المنطقة
- Sobha Hartland II
- الحالة
- قيد الإنشاء
- السعر يبدأ من
- السعر عند الطلب
- التسليم
- Q1 2027 – April 2028
- خطة السداد
- 60/40 — Sobha Hartland II standard terms
أنواع المساكن: 1 Bedroom · 2 Bedroom · 3 Bedroom
نظرة عامة
باللغة الإنجليزية كما نُشر في الأصل.
Riverside Crescent is the earliest-delivering cluster within Sobha Hartland II, with towers handing over between Q1 2027 and April 2028. The crescent configuration maximises water frontage across the towers.
Being first to hand over within a masterplan has a practical advantage: you take possession while the wider community is still completing, which historically means buying at pricing set before the amenities are visible. It also means living alongside ongoing construction for a period.
For yield-focused buyers, earlier handover means rental income starts sooner — a meaningful difference against Skyvue's 2029 timeline.
أبرز المزايا
باللغة الإنجليزية كما نُشر في الأصل.
- Earliest handover within the Hartland II masterplan
- Crescent layout maximising waterfront outlook
- Rental income begins sooner than later Hartland II phases
اعتبارات مهمة
باللغة الإنجليزية كما نُشر في الأصل.
- Surrounding masterplan still under construction at handover
- 40% payable on handover under the 60/40 structure
- Confirm the specific tower's handover date — the range spans over a year
المصادر
- Riverside Crescent handover schedule — تاريخ الاطلاع 2026-08-21